Hazards: structural (hardware), data (RAW true; WAR/WAW name dependences, only with out-of-order completion), control (branches). CPI = 1 + stalls; speedup = k/(1 + stalls); cycles = k + n − 1 + stalls. Without forwarding (split RF): 2/1/0 stalls for distance 1/2/3; with forwarding: ALU→ALU 0, load-use 1. Branch penalty = r − 1; stall CPI = 1 + f_b·penalty; predict-not-taken 1 + f_b·p_taken·penalty; delay slots always execute.
BMerged rule card
5.2.1 Structural hazards and stalls; CPI and speedup with stalls
- Hazards: structural (hardware), data (values), control (branches).
- Stall = bubble; CPI = 1 + average stalls.
- Speedup (balanced, no overhead) = k / (1 + stalls); in general (CPI·T)_np / (CPI·T)_p.
- Total cycles = k + n − 1 + stalls.
5.2.2 Data dependences: RAW, WAR, WAW; finding them in code
- RAW: later reads what earlier writes (true). WAR: later writes what earlier reads (anti). WAW: both write (output).
- Count only nearest pairs (no intervening write).
- In-order 5-stage: only RAW stalls. Renaming removes WAR/WAW.
5.2.3 Handling data hazards: stalling, operand forwarding, the load-use hazard
- No forwarding, split RF: stalls 2/1/0 for distance 1/2/3 (no split: 3/2/1).
- Forwarding: ALU→ALU 0 stalls; load→next use 1 stall; distance 2 after a load: 0.
- Cycles = k + n − 1 + stalls; draw the diagram when dependences overlap.
- Scheduling independent instructions after loads hides the load-use stall.
5.2.4 Control hazards: branch penalty, flushing, prediction, delayed branch
- Penalty = r − 1 (resolution at the end of stage r): EX → 2, ID → 1.
- Stall: CPI = 1 + f_b·penalty. Predict-not-taken: 1 + f_b·p_taken·penalty.
- Delay slots always execute; filled slots hide penalty.
- Count only executed instructions; next fetch after resolution.
CInterleaved GATE-style questions
Q1NAT2 marksSpeedup
Balanced 5-stage pipeline; 30% of instructions incur 1 stall, 5% incur 4 stalls. Speedup over non-pipelined?
Numerical answer: ________
Q2NAT2 marksDependences
Count all dependences (RAW + WAR + WAW): I1: ADD R1, R2, R3 · I2: SUB R2, R1, R4 · I3: MUL R1, R2, R2.
Numerical answer: ________
Q3NAT2 marksForwarding
With forwarding: LOAD R1, 0(R2) · LOAD R3, 4(R2) · ADD R4, R1, R3 · STORE R4, 8(R2). Cycles?
Numerical answer: ________
Q4NAT2 marksNo forwarding
The same four instructions without forwarding (split RF). Cycles?
Numerical answer: ________
Q5NAT1 markBranch penalty
Branches are resolved at the end of ID in a 5-stage pipeline that stalls on branches. Penalty?
Numerical answer: ________
Q6NAT2 marksBranch CPI
15% branches, all stalled for 3 cycles; plus 20% loads, half of them followed by a dependent instruction (1 stall). CPI?
Numerical answer: ________
Q7MCQ1 markLoad-use
Which situation still needs a stall even with full forwarding?
- (A) An ALU result used two instructions later
- (B) A loaded value used by a store's data two instructions later
- (C) An ALU result used by the next instruction
- (D) A loaded value used by the next instruction
Q8MSQ2 marksHazard kinds
Which pairs are matched correctly?
- (A) Single memory port — structural hazard
- (B) WAW — structural hazard
- (C) RAW — data hazard
- (D) Branch — control hazard
DAnswer Vault
Answer Vault
Try the questions first. Open when you are ready to check.
Q1 Answer: 3.33 to 3.342 marks
CPI 1 + 0.3 + 0.2 = 1.5; 5/1.5 = 3.33.
Re-read: Lesson 5.2.1 — Structural hazards and stalls; CPI and speedup with stalls
Q2 Answer: 52 marks
RAW: I1→I2 (R1), I2→I3 (R2). WAR: I1→I2 (I1 reads R2, I2 writes it), I2→I3 (I2 reads R1, I3 writes it). WAW: I1→I3 (R1). 2 + 2 + 1 = 5.
Re-read: Lesson 5.2.2 — Data dependences: RAW, WAR, WAW; finding them in code
Q3 Answer: 92 marks
R3 is used right after its load: 1 stall; the store gets R4 forwarded. 8 + 1.
Re-read: Lesson 5.2.3 — Handling data hazards: stalling, operand forwarding, the load-use hazard
Q4 Answer: 122 marks
ADD needs R3 at distance 1 (2 stalls); STORE needs R4 at distance 1 (2 stalls). 8 + 4.
Re-read: Lesson 5.2.3 — Handling data hazards: stalling, operand forwarding, the load-use hazard
Q5 Answer: 11 mark
2 − 1.
Re-read: Lesson 5.2.4 — Control hazards: branch penalty, flushing, prediction, delayed branch
Q6 Answer: 1.552 marks
1 + 0.45 + 0.1.
Re-read: Lesson 5.2.4 — Control hazards: branch penalty, flushing, prediction, delayed branch
Q7 Answer: (D)1 mark
The loaded value appears only at the end of MEM.
- (A) is wrong: Forwarded from MEM/WB.
- (B) is wrong: Distance 2, no stall.
- (C) is wrong: Forwarded from EX/MEM.
Re-read: Lesson 5.2.3 — Handling data hazards: stalling, operand forwarding, the load-use hazard
Q8 Answer: (A) (C) (D)2 marks
WAW is a data (name) dependence.
- (B) is wrong: WAW concerns register names, not hardware.
Re-read: Lesson 5.2.1 — Structural hazards and stalls; CPI and speedup with stalls